Lifecycle
APD review
—
file → approval
Plan → spud
—
approval → drilling
Drilling
13d
spud → TD
TD → EOR
—
TD → end-of-ops
Full cycle
—
first APD → EOR
Plan slip
—
—
APDs filed
0
APMs filed
0
plan modifications
APM resubmittals
0
revision cycles
WARs filed
—
weekly activity reports
Final status
PA
2 event(s) · full audit log
| Date | Event | Op code | Status | Source ID |
|---|---|---|---|---|
| 1962-06-15 | SPUD | — | — | 177070008900 |
| 1962-06-28 | TD_REACHED | — | — | 177070008900 |
Released data (BSEE FRS)
Files released
6
document types: 5
Total volume
18.2 MB
Well logs
3
LWD/MWD/wireline
WARs
0
APD docs
0
APM docs
0
Surveys
2
directional + pressure
BHP tests
0
First release 1964-08-27 · last release 1967-08-29 · showing 6 most-recent files · view full document report →
| File | Run date | Created | Released | Category | Scale | Length | Method | Logging Company | Log Name | TLI (ft) | BLI (ft) | WD (ft) | Vol | Barcode | Size | Ext | Src | QC |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
View
Download |
1962-06-28 | 2009-07-01 | 1967-08-29 | WELL_LOG | — | — | — | — | Velocity Log | 3,000 | 10,146 | 62 | VELOCITY | vs0000217 | 14.1 MB | TIF | MMS | Y |
View
Download |
— | 2008-10-17 | 1967-08-29 | SURVEY | — | — | — | — | Velocity Survey | — | — | 62 | — | — | 442.6 KB | TIF | — | — |
View
Download |
— | 2003-10-14 | 1967-08-29 | SURVEY | — | — | — | — | Velocity Survey | — | — | 62 | — | — | 146.2 KB | TIF | — | — |
View
Download |
— | 2005-06-14 | 1967-08-29 | COMPLETION | — | — | — | — | Well Completion Report | — | — | 62 | — | — | 63.6 KB | TIF | — | — |
View
Download |
1962-06-25 | — | 1964-08-27 | WELL_LOG | 1in | MD | WL | — | Electrical Log | 644 | 10,159 | 62 | SMCD0002 | — | 624.0 KB | TIF | PETRIS | N |
View
Download |
1962-06-25 | — | 1964-08-27 | WELL_LOG | 5in | MD | WL | — | Electrical Log | 644 | 10,159 | 62 | SMCD0002 | — | 2.9 MB | TIF | PETRIS | N |
Velocity survey (check-shot)
seismic calibrationPoints
10
depth-time samples
Surveys
1
distinct dates
Max depth
9,928ft
deepest point
Max 1-way time
1,300ms
Avg velocity
7,636ft/s
depth ÷ 1-way time
Survey date
1962-06-26
Showing 10 of 10 points · 2D (top): depth-down vs one-way travel time — geophysicists use this curve to convert seismic two-way time to actual feet .
| Survey date | One-way time (ms) | Depth (ft) | Avg velocity (ft/s) |
|---|---|---|---|
| 1962-06-26 | 0.0 | 0 | — |
| 1962-06-26 | 12.0 | 62 | 5,166 |
| 1962-06-26 | 474.0 | 2,928 | 6,177 |
| 1962-06-26 | 609.0 | 3,928 | 6,449 |
| 1962-06-26 | 737.0 | 4,928 | 6,686 |
| 1962-06-26 | 857.0 | 5,928 | 6,917 |
| 1962-06-26 | 976.0 | 6,928 | 7,098 |
| 1962-06-26 | 1086.0 | 7,928 | 7,300 |
| 1962-06-26 | 1198.0 | 8,928 | 7,452 |
| 1962-06-26 | 1300.0 | 9,928 | 7,636 |
Survey note: H OCS-G 1176 Well # 001 SM 0005 H KB = 69 ' MD= 10,146 ' TVD= 10,146 '
Drilling-permit history (0)
| Status date | Permit type | Well type | WD (ft) | Rig | Operator at filing |
|---|---|---|---|---|---|
| No drilling-permit records on file for this well. | |||||