Wells G01176 177070008900

001 ST00BP00

177070008900 PA E Document report → Lifecycle report →
Operator
Shell USA, Inc.
Surface lease
G01176
Bottom-hole lease
G01176
BH block
SM-5
Spud
1962-06-15
Total-depth date
1962-06-28
Status date
1962-07-29
Bottom-hole MD
10,146 ft
True vertical depth
10,146 ft
Water depth
62 ft
Region
G
Surface
28.9988, -92.0222
Bottom-hole
28.9988, -92.0222

Lifecycle

APD review
file → approval
Plan → spud
approval → drilling
Drilling
13d
spud → TD
TD → EOR
TD → end-of-ops
Full cycle
first APD → EOR
Plan slip
APDs filed
0
APMs filed
0
plan modifications
APM resubmittals
0
revision cycles
WARs filed
weekly activity reports
Final status
PA
2 event(s) · full audit log
DateEventOp codeStatusSource ID
1962-06-15 SPUD 177070008900
1962-06-28 TD_REACHED 177070008900

Released data (BSEE FRS)

Files released
6
document types: 5
Total volume
18.2 MB
Well logs
3
LWD/MWD/wireline
WARs
0
APD docs
0
APM docs
0
Surveys
2
directional + pressure
BHP tests
0

First release 1964-08-27 · last release 1967-08-29 · showing 6 most-recent files · view full document report →

6 of 6 rows Filters are case-insensitive text-contains
File Run dateCreatedReleased Category ScaleLengthMethod Logging CompanyLog Name TLI (ft)BLI (ft)WD (ft) VolBarcode SizeExtSrcQC
View Download
1962-06-28 2009-07-01 1967-08-29 WELL_LOG Velocity Log 3,000 10,146 62 VELOCITY vs0000217 14.1 MB TIF MMS Y
View Download
2008-10-17 1967-08-29 SURVEY Velocity Survey 62 442.6 KB TIF
View Download
2003-10-14 1967-08-29 SURVEY Velocity Survey 62 146.2 KB TIF
View Download
2005-06-14 1967-08-29 COMPLETION Well Completion Report 62 63.6 KB TIF
View Download
1962-06-25 1964-08-27 WELL_LOG 1in MD WL Electrical Log 644 10,159 62 SMCD0002 624.0 KB TIF PETRIS N
View Download
1962-06-25 1964-08-27 WELL_LOG 5in MD WL Electrical Log 644 10,159 62 SMCD0002 2.9 MB TIF PETRIS N

Velocity survey (check-shot)

seismic calibration
Points
10
depth-time samples
Surveys
1
distinct dates
Max depth
9,928ft
deepest point
Max 1-way time
1,300ms
Avg velocity
7,636ft/s
depth ÷ 1-way time
Survey date
1962-06-26

Showing 10 of 10 points · 2D (top): depth-down vs one-way travel time — geophysicists use this curve to convert seismic two-way time to actual feet .

Survey date One-way time (ms) Depth (ft) Avg velocity (ft/s)
1962-06-26 0.0 0
1962-06-26 12.0 62 5,166
1962-06-26 474.0 2,928 6,177
1962-06-26 609.0 3,928 6,449
1962-06-26 737.0 4,928 6,686
1962-06-26 857.0 5,928 6,917
1962-06-26 976.0 6,928 7,098
1962-06-26 1086.0 7,928 7,300
1962-06-26 1198.0 8,928 7,452
1962-06-26 1300.0 9,928 7,636

Survey note: H OCS-G 1176 Well # 001 SM 0005 H KB = 69 ' MD= 10,146 ' TVD= 10,146 '

Drilling-permit history (0)

Status datePermit typeWell type WD (ft)RigOperator at filing
No drilling-permit records on file for this well.