G007 ST00BP00 · Full lifecycle
177074076900 CNL Black Elk Energy Offshore Operations, LLCLifecycle duration
—
first APD → EOR
Phases with activity
2
—
Released files
2
2.9 MB total
Lifecycle events
0
Drilling permits
0
— APDs · — APMs
BHP surveys
0
Planning & Permitting
Categories: APD, APM, REVISIONAPD review
—
Approval → spud
—
APDs filed
—
APMs filed
—
— resubmittals
Files (1 · 2.8 MB)
| File | Run date | Created | Released | Category | Scale | Length | Method | Logging Company | Log Name | TLI (ft) | BLI (ft) | WD (ft) | Vol | Barcode | Size | Ext | Src | QC |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
View
Download |
— | 2010-06-10 | 2007-12-18 | APD | — | — | — | — | APD-Application for Permit to Drill | — | — | 83 | — | — | 2.8 MB | TIF | — | — |
Sundries & Other
Categories: SUNDRY, OTHERFiles (1 · 71.8 KB)
| File | Run date | Created | Released | Category | Scale | Length | Method | Logging Company | Log Name | TLI (ft) | BLI (ft) | WD (ft) | Vol | Barcode | Size | Ext | Src | QC |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
View
Download |
— | 2001-12-04 | 2010-11-16 | SUNDRY | — | — | — | — | Sundry Report | — | — | 83 | — | — | 71.8 KB | TIF | — | — |