SN219 ST00BP01 · Full lifecycle
608124014301 COM Shell Offshore Inc.Lifecycle duration
29d
first APD → EOR
Phases with activity
4
2023-02-14 → 2023-04-06
Released files
10
317.7 MB total
Lifecycle events
24
Drilling permits
5
5 APDs · 1 APMs
BHP surveys
0
Phase timeline
Each bar is the activity window of one phase (earliest → latest record). Phases without dated records are not shown here but still appear below.
Planning & Permitting
2023-02-12 → 2023-03-08 Categories: APD, APM, REVISIONAPD review
21d
Approval → spud
-22d
APDs filed
5
APMs filed
1
1 resubmittals
Events (18)
| Date | Event | Op code | Status | Source |
|---|---|---|---|---|
| 2023-02-12 | APD_REQ_SPUD | — | — | -24847 |
| 2023-02-12 | APD_REQ_SPUD | — | — | -24755 |
| 2023-02-12 | APD_REQ_SPUD | — | — | -24791 |
| 2023-02-12 | APD_REQ_SPUD | — | — | -24776 |
| 2023-02-12 | APD_REQ_SPUD | — | — | -24772 |
| 2023-02-15 | APD_FILED | — | — | -24755 |
| 2023-02-16 | APD_APPROVED | — | — | -24755 |
| 2023-02-16 | APD_APPROVED | — | — | -24772 |
| 2023-02-16 | APD_FILED | — | — | -24772 |
| 2023-02-17 | APD_APPROVED | — | — | -24776 |
| 2023-02-17 | APD_FILED | — | — | -24776 |
| 2023-02-21 | APD_FILED | — | — | -24791 |
| 2023-02-22 | APD_APPROVED | — | — | -24791 |
| 2023-02-23 | APM_FILED | COMP | COM | -246028 |
| 2023-03-03 | APM_APPROVED | COMP | COM | -246028 |
| 2023-03-03 | APM_RESUB | COMP | COM | -246028 |
| 2023-03-06 | APD_FILED | — | — | -24847 |
| 2023-03-08 | APD_APPROVED | — | — | -24847 |
Drilling permits (5)
| Status date | Permit type | Well type | WD (ft) | Rig | Operator |
|---|---|---|---|---|---|
| 2023-02-16 | REVISED BYPASS | E | 9,588 | T.O. DEEPWATER THALASSA | Shell Offshore Inc. |
| 2023-02-16 | BYPASS | E | 9,588 | T.O. DEEPWATER THALASSA | Shell Offshore Inc. |
| 2023-02-17 | REVISED BYPASS | E | 9,588 | T.O. DEEPWATER THALASSA | Shell Offshore Inc. |
| 2023-02-22 | REVISED BYPASS | E | 9,588 | T.O. DEEPWATER THALASSA | Shell Offshore Inc. |
| 2023-03-08 | REVISED BYPASS | E | 9,588 | T.O. DEEPWATER THALASSA | Shell Offshore Inc. |
Drilling
2023-02-12 → 2023-04-06 Categories: WAR, CORE, GEOLOGY, SURVEYDrilling days
2d
spud → TD
WARs filed
9
Spud date
2023-02-14
TD date
2023-02-16
Events (5)
| Date | Event | Op code | Status | Source |
|---|---|---|---|---|
| 2023-02-12 | WAR_FIRST | — | 9 | — |
| 2023-02-14 | SPUD | — | — | 608124014301 |
| 2023-02-16 | TD_REACHED | — | — | 608124014301 |
| 2023-03-04 | APM_WORK_START | COMP | COM | -246028 |
| 2023-04-06 | WAR_LAST | — | 9 | — |
Files (1 · 235.7 KB)
| File | Run date | Created | Released | Category | Scale | Length | Method | Logging Company | Log Name | TLI (ft) | BLI (ft) | WD (ft) | Vol | Barcode | Size | Ext | Src | QC |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Inspect
Download |
2023-02-21 | 2023-03-06 | 2025-04-17 | Directional Survey Digital | — | — | — | — | Directional Survey | — | — | 9,588 | — | — | 235.7 KB | ZIP | — | — |
Logging & Evaluation
2023-02-16 → 2023-02-18 Categories: WELL_LOGFiles (9 · 317.5 MB)
| File | Run date | Created | Released | Category | Scale | Length | Method | Logging Company | Log Name | TLI (ft) | BLI (ft) | WD (ft) | Vol | Barcode | Size | Ext | Src | QC |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
View
Download |
2023-02-18 | 2023-03-08 | 2025-04-17 | WELL_LOG | 5in | MD | MWD | Schlumberger Well Surveying Corp | Drilling Mechanics | 9,690 | 28,630 | 9,588 | TGSX1563 | — | 24.2 MB | TIF | A2D | N |
View
Download |
2023-02-18 | 2023-03-08 | 2025-04-17 | WELL_LOG | 1in | MD | MWD | Schlumberger Well Surveying Corp | Resistivity-Blended | 9,850 | 28,622 | 9,588 | TGSX1563 | — | 7.3 MB | TIF | A2D | N |
View
Download |
2023-02-18 | 2023-03-08 | 2025-04-17 | WELL_LOG | 1in | TVD | MWD | Schlumberger Well Surveying Corp | Resistivity-Blended | 9,850 | 27,521 | 9,588 | TGSX1563 | — | 8.5 MB | TIF | A2D | N |
View
Download |
2023-02-18 | 2023-03-08 | 2025-04-17 | WELL_LOG | 5in | MD | MWD | Schlumberger Well Surveying Corp | Resistivity-Blended | 9,850 | 28,622 | 9,588 | TGSX1563 | — | 42.1 MB | TIF | A2D | N |
View
Download |
2023-02-18 | 2023-03-08 | 2025-04-17 | WELL_LOG | 5in | TVD | MWD | Schlumberger Well Surveying Corp | Resistivity-Blended | 9,850 | 27,521 | 9,588 | TGSX1563 | — | 41.2 MB | TIF | A2D | N |
View
Download |
2023-02-17 | 2023-03-08 | 2025-04-17 | WELL_LOG | 5in | MD | MWD | Schlumberger Well Surveying Corp | VISION Resistivity - Dual Frequency | 9,850 | 28,622 | 9,588 | TGSX1563 | — | 44.7 MB | TIF | A2D | N |
Inspect
Download |
2023-02-16 | 2023-03-14 | 2025-04-17 | Mudlog Digital | — | — | — | — | Mudlog | — | — | 9,588 | — | — | 103.4 MB | ZIP | — | — |
Inspect
Download |
— | 2023-10-10 | 2025-04-17 | Raw Log Samples Digital | — | — | — | — | Raw Log Samples | — | — | 9,588 | — | — | 43.9 MB | ZIP | — | — |
Inspect
Download |
— | 2023-10-10 | 2025-04-17 | Raw Log Samples Digital | — | — | — | — | Raw Log Samples | — | — | 9,588 | — | — | 2.1 MB | ZIP | — | — |
End of Operations
2023-03-16 → 2023-03-16 Categories: EORTD → EOR
28d
EOR filed
2023-03-16
Final status
COM
Events (1)
| Date | Event | Op code | Status | Source |
|---|---|---|---|---|
| 2023-03-16 | EOR_FILED | C | COM | -198953 |